Back to jobs

Offshore Main Crane Operator | Various Offshore vessels | Worldwide

WorldwidePosted 9h ago

About this role

Rank: Offshore Main Crane Operator · Vessel: Offshore - Heavy Lift Crane

Offshore Main Crane Operator is needed for various Offshore vessels, worldwide. Employment is with our client, a drilling and construction contractor. 

Job information

  • Position: Main Crane Operator Between 250 – 2000t.
  • Project: Various Offshore vessels.
  • Location: Worldwide.
  • Contract Status: Unlimited contract.
  • Start date: Depending on availability.
  • Probation period: 90 working days.
  • Notice period: 60 calendar days’ notice from the first to ninth years of service; 90 calendar days’ notice thereafter. 
  • Rotation: 35/35 on/off.
  • Salary: Please indicate your realistic consolidated monthly wage expectations in EUR/USD/GBP. Consolidated monthly salary paid only when working, not when on leave. 
  • Overtime: Applicable.
  • Working days/ hours: 12 hours per day, 7 days per week.
  • Insurances: Provided by the Company.
  • Travel: According to Corporate Standards, Prepaid Economy class ticket at beginning, end of CNT and for each work leave rotation cycle.
  • Employment: Our client, a drilling and construction contractor. 

Requirements/ Qualifications/ Competence

  • Consistent experience onboard heavy lift vessels with Main Crane. Lifts from 400t and above done with the Main Crane are counted as relevant for the position.
  • Good English knowledge is required, at least B1 level.
  • Stage 3 certification. Both valid and recently expired are accepted.
  • IMCA Logbook that reflects the experience stated in the CV. 

Tasks

  • Operate the crane within the designed crane load capacity, in accordance with the derating tables applicable to existing weather and sea state conditions.
  • Performs basket transfers where permitted and safe to do so.
  • Hold the Offshore Crane Operator certification (level 2 for unsupervised inboard lifts; level 3 for unsupervised offshore lifts).
  • Be aware of the surroundings in terms of potential clashes with other vessel equipment.
  • Be aware of crane limits in terms of reach and capacity.
  • On vessels with multiple cranes, be aware of the interaction with other cranes and proactively intervene in order to avoid any interference during simultaneous operations.
  • Interact with the supervisors in order to define the lifting procedures.
  • Report any crane equipment malfunctioning to own supervisor.
  • Ensure that all safe work procedures for crane lifts are adhered to.
  • Liaise with Bridge and 1st Assistant/Deck Foreman while executing any lifts that could affect the vessel stability.
  • Make daily inspection of crane cables.
  • Carry out daily routine maintenance to the crane and the operator's cabin.
  • Keep a high level of housekeeping on the crane and in the operator's cabin.
  • Liaise with 2nd Engineer/Crane Engineer/Chief Electrician/Vessel Equipment Engineer on crane maintenance and performance, in order to ensure that repairs and preventive maintenance are carried out properly.
  • Carry out weekly inspection of the crane in accordance with the manufacturer's recommendations.
  • Fill up the crane log book as required for all lifts above 50 ton.
  • Issue work instructions to the Tuggerhoist Operators.
  • Stop the lifting activity if required on safety or technical grounds, if continuing could cause any damages or injuries.
  • Report to the 1st Assistant, while taking instructions directly from the Deck Foreman during lifting operations.

Create account to apply

Already have an account? Sign in